Bucket wheel dredger mainly consists of several major parts such as bucket wheel, bucket wheel frame, floatation box, cabin, mud transfer pipe, suction pump, winch, positioning piles and so on.
The bucket wheel is of circular design, and the periphery of the bucket wheel is grooved reamer teeth. The bucket wheel rotates under the traction of the power system, and the upward reamer teeth will dig up and ream loose the mud. The outer side of the bucket wheel is the suction pump port, which can suck away the dredged mud from the bucket wheel and transport it to the designated position through the mud discharge pipeline; the bucket wheel frame can be regarded as the body of the bucket wheel, which can control the operation direction of the bucket wheel and the depth of the dredging under the co-operation of the winch and the positioning piles; the pontoon box mainly plays the role of the floating body, which can carry the impact force generated when dredging, and the pontoon box is generally installed on both sides of the hull, and the extra space can also be used for the staff to take a rest and relax. The pontoons are generally installed on both sides of the hull, and the extra space can be used for the staff to take a rest; the positioning pile system mainly carries the left and right swing and the overall movement of the hull.

TB-400 Inch Bucket Wheel Dredger
|
TB400 [16inc2500m3h] |
|
|
Dredger LOA |
32.0m |
|
Hull size(Lx BxH) |
19.0x7.52.0m |
|
Main pontoon(LxBxH) |
13.83.52.0m |
|
Side porloan(LxBaH) |
19.02.0x2.0m |
|
Dischange pipe innerDia |
400mm |
|
Head |
45m |
|
Max.dredging depth |
13m |
|
Waterflo |
2500m3h |
|
3oids andcapacity |
500m3h |
TB-450 Inch Bucket Wheel Dredger
|
|||
|
DredgerLOA |
34m |
||
|
Hul size(Lx BaH) |
23.0x7.52.5m |
||
|
Main panloon(LxBxH) |
13.8x3.52.5m |
||
|
Side pantoonjLxBxH) |
22.002.02.5m |
||
|
Discharge pipe innerDia |
450mm |
||
|
Head |
48m |
||
|
Ma.dredging depth |
14m |
||
|
Waterflaw |
3000m3h |
||
|
Solids and capacity |
600m3h |
||
TB-500 Inch Bucket Wheel Dredge
|
TB500 [20inch4000m3/h] |
|
|
Dredger LOA |
36.5m |
|
Hull size(Lx BxH) |
27.0x8.5X2.5m |
|
Main pontoon(LxBxH) |
15.4x3.5×2.5m |
|
Side pontoon(LXBxH) |
24.02.5X2.5m |
|
Discharge pipe innerDia |
500mm |
|
Head |
54m |
|
Max.dredging depth |
14m |
|
Waterflow |
4000m3/h |
|
Solds andcapacity |
800m3/h |
TB-550 Inch Bucket Wheel Dredge
|
TB550[22inch4500m3/h] |
|
|
Dredger LOA |
38.0m |
|
Hull size(Lx BxH) |
27.0x8.5X2.5m |
|
Main pontoon(LxBxH) |
15.4x3.5x2.5m |
|
Sidepontoon(LxBxH) |
24.0x2.5X2.5m |
|
Discharge pipe innerDia |
550mm |
|
Head |
57m |
|
Max.dredging depth |
16m |
|
Waterflow |
4500m3/h |
|
Solds andcapacity |
900m3/h |
.
Other features
□standard design, allowing for short delivery times and competitive pricing
□spare parts available from stock
□durable heavy-duty marine engine compliant with IMO Tier II
□efficient fuel consumption
□fresh-water engine cooling system
□the dredge pump is driven through integrated bearing block, clutch, and reduction gearbox
□white iron-wear parts for the dredge pump
□cutter drive accepts temporary overload, resulting in high maximum cutter power
□reliable hydraulic system
□completely assembled and fully tested afloat before delivery
□dismountable and transportable by road, rail, or sea
□ready for operation on arrival at the site
□one-man operation
□wide range of services and auxiliary equipment available (including work boats, boosters and pipelines).
Optional extra's
□spud-carriage installation
□anchor booms
□swivel bend
□non-return valve and vacuum-relieve valve
□production measurement, automation, and positioning system
□Operator Assist System for online monitoring
□increased discharge pipeline diameter
□increased dredging depth
□life-cycle support packages (including training, technical support, etc.)
□optional packages: comfort (including air conditioning);
□HSE (health, safety, and environment); nautical; and inventory plus.
TRODAT® is available with a full range of spare parts, maintenance support, equipment training programs, dredging consulting services and dredging operators for hands-on instruction and commissioning.
Our address
3F, Building 3, Headquarter of Brocade Group, No.9 Gangxing Road, Jinan, Shandong Province, P.R. China
Whats APP
+(86) 15550047599
trodat@trodatgroup.com

Hot Tags: 16丨18丨20丨22-inch Bucket Wheel Dredger, China, suppliers, manufacturers, factory, price, for sale










