What Are The Installation Steps Of Shajin Equipment

Feb 02, 2020

1. Install the main frame of the sand gold equipment according to the drawings.

2. Install the desilting equipment of the sand gold equipment.

3. Install the screening equipment of the sand gold equipment, such as vibrating screen or drum screen, including the receiving hopper of the screening equipment.

4. Install the gold recovery equipment of the sand gold equipment, such as a chute, agitation chute or a Nielsen concentrator.

5. Install the feed bin.

6. Install the equipment's water supply pipes, valves, tees, steel wire hoses, iron pipes, etc.

7. After the equipment is installed, connect the cables of the motors of the Shajin equipment, including the water supply pump.

8. Add corresponding oil to each reducer and water pump, such as gear oil or engine oil, hydraulic oil, etc.

9. Add water and oil to the generator set.

10. After everything is ready, debug the grading screen, desliming equipment, gold enrichment equipment, etc. one by one. After debugging, start the whole set of equipment, run for at least 1 hour, shut down, and check whether the bolts at each part are loose or the triangle belt Whether it is tightened, whether there is abnormal noise in the bearing, etc., if the problem is found, rectify it immediately. After everything is normal, you can start production.